ACOMarine 's new wastewater treatment system will be installed on ActaMarine 's state-of-the-art " ActaOrion " wind farm support vessel.
The wastewater treatment system is designed to meet the requirements of the International Maritime Organization's MEPC227 (64) resolution on emissions standards. The system will be equipped with the “ ActaOrion †at the Stocznia shipyard in Poland .
After delivery this year, the wind farm support vessel designed by CIG will be the latest vessel of the ActaMarine fleet. The ship is 108 meters long and 16 meters wide and is equipped with a DP2 dynamic positioning system that will be leased to VanOord 's North Sea Gemini offshore wind farm in the Netherlands .
3D Printing,3 D Printer,3 D Printing,3D Printing Materials
WUXI SHINDEN MODERN INTELLIGENT TECHNOLOGY CO.,LTD , https://www.myshinden.com