The National Development and Reform Commission recently issued a notice and decided to focus on organizing and carrying out special work for the development of 10 major technical equipment. Zhu Yongyong, director of the China National Machinery Industry Federation’s major equipment office participating in the drafting of the “Notice”, said that the country’s major technical equipment development projects rely on major national construction projects and key construction projects in order to solve the urgently needed major equipment for the development of the national economy, and at the same time improve The level of China's equipment manufacturing industry. These 10 special projects all belong to the national “Eleventh Five-Year Plan” research projects and are a continuation and supplement of the “Tenth Five-year Plan”. The 10 special projects embody the characteristics of major technical equipment with high technical difficulty, complete sets, strong investment, and long production cycle, and have strong radiation and leading role for the entire equipment manufacturing industry. Yan Yongbin briefly introduced ten special items as follows: Development of supporting equipment for the Three Gorges Project. The left bank of the Three Gorges Project is fully imported. Of the 12 units on the right bank, 4 are imported, and 8 are domestically manufactured. Domestically produced units will receive special support. DC transmission equipment. The Three Gorges to Shanghai Wanvu HVDC transmission complete sets of equipment are inviting tenders, and bidding for the second-line (Guizhou-Guangdong) HVDC transmission complete sets of equipment will also be conducted. Ultra-supercritical firepower machine equipment. Including manufacturing technology and materials, at present, China has too little control, and we must step up research and development. Large-scale air-cooled thermal power plant equipment. The key is system design technology for large air coolers. Large-scale pumped storage machine equipment. At present, more than a dozen sets are in operation in China, all of which are imported equipment. The state will support 14 sets of approved construction. Heavy gas turbine combined cycle power generation technology and complete sets of equipment. In this respect, there is a big gap between China and foreign countries. Foreign countries do not transfer design technologies. We only have some manufacturing techniques and we must find ways to narrow the gap. High-tech ships and ancillary equipment. China's large-scale container ships have already reached a certain level. In the future, we will focus on the development of large bulk carriers and large LNG carriers. Railway modernization equipment. Mainly high-speed railways with a speed of 300 mph and quasi-high speed railways with a speed of 220 mph or more, including locomotives, control systems, and signal systems. Annual output of 6 million tons of fully-mechanized mining equipment. At present, underground well-mechanized coal mining equipment has not yet been domesticated. A set of imports will cost 30 million to 40 million U.S. dollars, and if it does not carry out localization, it will need to import 200 sets in the next 15 years. Million kilowatts of nuclear power plant equipment. The number of nuclear power units put into operation and under construction today is 7.8 million kilowatts. It is still necessary to build 36 million to 40 million kilowatts by 2020, which means that 2 to 3 million kilowatts will be put into operation each year. The localization rate of millions of kilowatts of units is still low, and the pace of localization should be accelerated. The introduction of advanced technology will not forget self-development. Since 1983, China’s major technological equipment has taken a road to market-based technology. At the same time as the import of equipment, the introduction of foreign advanced manufacturing technology, through the digestion and absorption of the introduction of technology, eventually forming the ability of independent development. After more than 20 years of unremitting efforts, China's major technical equipment manufacturing capabilities and levels have been greatly improved. The special project is also to introduce foreign advanced technology, through the combination of bidding, technology and trade, and cooperation in manufacturing, thereby shortening the development cycle, and achieving a high starting point and development. However, while introducing technology, we must not neglect self-development, and we must not give up when we develop independently. Special emphasis was placed on the importance of independent development before the introduction of technology. Through the self-development in advance, it is possible to make secondary development based on digestion and absorption, so as to avoid secondary introduction. He cited the lessons learned from the second introduction of thermal power units. The country's major technical equipment development projects are based on national major construction projects and key construction projects, insisting on the combination of imported technology, digestion and absorption and independent innovation, and arranging domestic independent development and technological research. In the future such projects will no longer be introduced.

 As lifting and transporting machinery, Wings FR Series 1 ton Counterbalanced Battery Powered Forklift Trucks are widely used for loading, unloading and transporting the packaged goods in factories, warehouses, stations, wharves, ports and so on. The fork lift truck can also be used for bulk goods and unpacked good loading, unloading and handing after assembled with other attachments. 

1T Electric Forklift belongs to Small Electric Forklift. It also has 0.8T Electric Forklift, 1.5t Electric Forklift, 2t Electric Forklift and 2.5T Electric Forklift.

1t Electric Forklift

1T Electric Forklift,Small Electric Forklift,Mini Electric Forklift,Electric Forklift Motor

Shandong Wings Heavy Machinery Co.,Ltd , https://www.forkliftwings.com