Including pure iridium compound prepared is reduced to metal and calcined in two steps.
1. The preparation of pure hydrazine compound has nitroso complexation, sulfurization and extraction methods.
(1) Sodium nitrite complexation The red chlorohydrazine solution was adjusted to a pH of about 1 with dilute lye, and was added to NaNO 2 to boil and converted to a pale yellow Na 3 Ir(NO 2 ) 6 solution. The reaction was:
H 3 IrCl 6 +6NaNO 2 =====Na 3 Ir(NO 2 ) 6 +3HCl+3NaCl
After cooling, the impurity precipitate was filtered off. The hydrazine solution is boiled with concentrated hydrochloric acid and re-converted to Na3 IrC}. The reaction is:
Na 3 Ir(NO 2 ) 6 +6HCI=====Na 3 IrCl 6 +6HNO 2
After repeated complexation to the required purity, the chlorine gas is oxidized and ammonium chloride is added to precipitate ammonium chlorate:
Na 3 IrCl 6 +2NH 4 Cl+0.5Cl 2 =====(NH 4 ) 2 IrCl 6 ↓+3NaCl
(2) Vulcanization method The purer chlorohydrazine solution (铱 concentration 60-80g/L) is slowly added (NH 4 ) 2 S, Na 2 S or H 2 S at room temperature to make trace impurities of noble and bismuth metals. The sulfide was precipitated, and after standing overnight, a pure chlorinic acid solution was obtained by filtration. Adding ammonium chloride and adding nitric acid or oxidizing with chlorine gas precipitates a black silky (NH 4 ) 2 IrCl 6 crystal:
H 3 IrCl 6 +2NH 4 Cl+0.5Cl 2 =====(NH 4 ) 2 IrCl 6 ↓+3HCl
Base metals and more soluble rhodium ammonium chloride remaining in the mother liquor. If the ammonium chloroantimonate obtained by filtration is not pure enough, it is slurried with water and added with an appropriate amount of hydrazine hydrate to reduce to soluble (NH 4 ) 3 IrCl 6 :
(NH 4 ) 2 IrCl 6 +N 2 H 4 ·H 2 O=====(NH 4 ) 3 IrCl 6 +0.5N 2 ↑+H 2 O
It is re-refined by the vulcanization method, and after passing the chlorine gas, the ammonium chloroantimonate is precipitated by oxidation.
(3) Extraction method The cerium-containing solution is extracted by P 204 to separate the ruthenium metal cation. The noble metal impurity is extracted by N 235 while maintaining the Ir(III) state, and the aqueous phase is oxidized by the chlorine gas to Ir(III) to Ir(IV). Extraction of [IrCl 6 ] 2- with 235 or TBP. The dilute sodium hydroxide solution is back-extracted, the stripping solution is boiled with hydrochloric acid, oxidized by chlorine gas, and ammonium chloride is precipitated by adding ammonium chloride. [next]
2. Metal preparation and product standards Pure ammonium chlorate is dried and heated to 350 ° C for 2 h, and then heated to 600 ° C to decompose the ammonium salt to produce metal bismuth:

The ammonium chloride white smoke is exhausted, cooled and transferred to a hydrogen reduction furnace for hydrogen reduction at a temperature of 800-900 ° C, and then replaced with an inert atmosphere and cooled to room temperature to obtain a metal ruthenium.
The Chinese metal bismuth product standard (GB1422-89) is shown in the table.

China Metal Antimony Product Standard ( GB1422-89 ) /%

species

Ir

Pt

Pd

Rh

Ag

Cu

Ni

Fe

Al

Pb  

Sn

Si

Total impurity

FIr-1

99.99

0.003

0.001

0.003

0.001

0.002

0

0

0

0.001

0.001

0.003

0.01

FIr -2

99.95

0.02

0.02

0.02

0.005

0.005

0.01

0.01

0

0.005

0.005

0.005

0.05

FIr -3

99.9

0.03

0.03

0.03

 

 

0.01

0.02

0

0.01

0.01

0.01

0.1

Steel Grate

The steel grate is an open steel member that is orthogonally combined with load-bearing flat steel and cross bars according to a certain distance, and fixed by welding or pressing; the cross bars generally use twisted square steel, and round steel can also be used. or flat steel,


The steel grate is generally made of carbon steel, and the surface is hot-dip galvanized, which can prevent oxidation. It can also be made of stainless steel. The steel grating has ventilation, lighting, heat dissipation, anti-skid, explosion-proof and other properties.

Steel grates are mainly used as gutter cover plates, steel structure platform plates, steel ladder treads, trench cover plates, steel ladder treads, building ceilings, etc.

Steel Grate Application

FAQ

Q1: Are you a factory?
A1: Yes, we are a professional manufacturer of wire mesh products focusing on wire mesh for decades.

Q2: How can I get a quotation?
A2: You need to provide material, sheet size, wire diameter, hole distance, and quantity for inquiry. Special requirements can also be specified.

Q3: Is it ok if I want free samples?
A3: Yes, we can provide free samples in 20cm-50cm sizes along with our catalog. But the express fee will be on your account. If you place an order, we will refund the courier fee.

Q4: What's your payment term?
A4: Generally, our payment terms are T/T 30% advance payment, balance 70% against copy of B/L. We can also discuss other payment terms.

Q5: How about your delivery time?
A5: 1. We always prepare enough stock materials for your urgent needs, and the lead time for all stock materials is 7 days.
Depending on quantity and technology, exact lead times and production schedules for non-stock items will be communicated to you.

Steel Grate,Galvanized Steel Grate,Heavy Duty Steel Grate,Galvanized Serrated Steel Grate

Anping County Dongjie Wiremesh Products Co., Ltd. , https://www.dongjiewiremesh.com