Some precautions to be taken when assembling explosion-proof ground loadometers Explosion-proof floor scales, as the name implies, have stringent requirements in the assembly of explosion proof loadometers. Need to pay attention to the following points.
(This type of product must be strictly in accordance with the corporate standard QB/HK-FBX.2-2010 standard)
1. Apply a layer of 0.1-0.3mm3# calcium base grease to the explosion-proof surface of the floor scale before fastening the floor weight cover.
2. When fastening the floor weight cover, tighten each bolt with a tightening torque to cross, symmetrically, gradually, and evenly.
3. Check the main fitting dimensions of the parts and components before assembly.
4. During the assembly process, the parts are not allowed to scratch, touch or scratch the explosion-proof surface.
5. When installing electrical components, note the proper position and install it securely.
6. When tightening screws and nuts, do not blow or use inappropriate screwdrivers and wrenches.
7. The line number is marked with a marking machine and the line number is clear and complete. Wiring attention to line sequence color and wire diameter.
8. After the assembly is completed, clean the surface of the floor platform and use foamed plastic for proper packaging to avoid damage to the floor platform structure and surface spray coating during transportation and installation.
9. After the installation of electrical equipment according to the electrical design requirements for debugging 10. After the end of the test, tighten the wiring harness, install the slot cover, pay attention to whether the ground wire is connected
(This type of product must be strictly in accordance with the corporate standard QB/HK-FBX.2-2010 standard)
1. Apply a layer of 0.1-0.3mm3# calcium base grease to the explosion-proof surface of the floor scale before fastening the floor weight cover.
2. When fastening the floor weight cover, tighten each bolt with a tightening torque to cross, symmetrically, gradually, and evenly.
3. Check the main fitting dimensions of the parts and components before assembly.
4. During the assembly process, the parts are not allowed to scratch, touch or scratch the explosion-proof surface.
5. When installing electrical components, note the proper position and install it securely.
6. When tightening screws and nuts, do not blow or use inappropriate screwdrivers and wrenches.
7. The line number is marked with a marking machine and the line number is clear and complete. Wiring attention to line sequence color and wire diameter.
8. After the assembly is completed, clean the surface of the floor platform and use foamed plastic for proper packaging to avoid damage to the floor platform structure and surface spray coating during transportation and installation.
9. After the installation of electrical equipment according to the electrical design requirements for debugging 10. After the end of the test, tighten the wiring harness, install the slot cover, pay attention to whether the ground wire is connected
Chemical fiber equipment bearings mainly used in chemical fiber equipment, and manufactured with high purity bearings steel, special material rolling elements, vacuum heat treatment, and advanced processing equipment. They have characteristics of high precision, anti-fatigue, long life, normal operating speed are 20,000 rpm to 40,000 rpm, and working life are over 9000 hours.
Chemical Fiber Bearings,Chemical Bearings,Chemical Fiber Equipment Bearing,Chemical Fiber Machinery Bearing
ZHEJIANG XCC GROUP CO.,LTD. , http://www.xccbearing.com