SZX jet pump installation items:
1. Consult the product instruction manual Consult the product manual for the installation dimensions and electrical parameters and other data to determine the installation wiring, installation location and wiring.
2. Connect the inlet and outlet lines as the pump inlet and outlet thread models, the appropriate pipe fittings and pipes, according to the installation of pipe to determine the length of the pipe size. When connecting the nipple, the nipple of the nipple is sealed with Teflon tape or similar sealing material. When installing and connecting the pump inlet and outlet to take over, it is necessary to ensure that the pump body will not withstand large hard tube torque and internal stress. Base mounted smoothly, and strive to surface contact, to avoid the pump dangling erection. It is recommended to install a check valve at the start and end of the inlet pipe to shorten the self-priming time and keep the pipe and pump chamber free of residual dirt.
3. Fixed pump base, the pump can be used with the bottom of the screw holes matching bolt fixed pump floor, in order to reduce the starting impact on the pump.
4. External Cables æ ¹ Electrical parameters such as the number of phases, current and voltage of the motor, and the starting method are equipped with the appropriate cable diameter and length. The wiring is wired according to the wiring diagram in the terminal box. The outlet terminal is screwed from the side of the terminal box Casing leads. In addition, the external motor cable connector requires reliable sealing, insulation and have a certain intensity.
5. Check the power and electronic control device wiring pump installation operation, be sure to connect the power cord and electric control wiring, and check the voltage, frequency and so on. Pump unit should be grounded, anti-leakage measures, electrical installations should ensure that the unit from the lack of phase voltage instability and overload damage.
1. Consult the product instruction manual Consult the product manual for the installation dimensions and electrical parameters and other data to determine the installation wiring, installation location and wiring.
2. Connect the inlet and outlet lines as the pump inlet and outlet thread models, the appropriate pipe fittings and pipes, according to the installation of pipe to determine the length of the pipe size. When connecting the nipple, the nipple of the nipple is sealed with Teflon tape or similar sealing material. When installing and connecting the pump inlet and outlet to take over, it is necessary to ensure that the pump body will not withstand large hard tube torque and internal stress. Base mounted smoothly, and strive to surface contact, to avoid the pump dangling erection. It is recommended to install a check valve at the start and end of the inlet pipe to shorten the self-priming time and keep the pipe and pump chamber free of residual dirt.
3. Fixed pump base, the pump can be used with the bottom of the screw holes matching bolt fixed pump floor, in order to reduce the starting impact on the pump.
4. External Cables æ ¹ Electrical parameters such as the number of phases, current and voltage of the motor, and the starting method are equipped with the appropriate cable diameter and length. The wiring is wired according to the wiring diagram in the terminal box. The outlet terminal is screwed from the side of the terminal box Casing leads. In addition, the external motor cable connector requires reliable sealing, insulation and have a certain intensity.
5. Check the power and electronic control device wiring pump installation operation, be sure to connect the power cord and electric control wiring, and check the voltage, frequency and so on. Pump unit should be grounded, anti-leakage measures, electrical installations should ensure that the unit from the lack of phase voltage instability and overload damage.
titanium iron
HUNAN ZHONGNAN ANTIMONY&TUNGSTEN TRADING CO.,LTD , https://www.zhongnanat.com