Â
MATERIALS | ||
ITEM | PARTSÂ NAME | MATERIAL |
1 | BODY | CARBON STEEL/STAINLESS STEEL |
2 | SEATÂ RING | BRASS/STAINLESSÂ STEEL |
3 | DISC | CARBON STEEL+BRASS/STAINLESSÂ STEEL |
4 | VALVEÂ GUIDE | CARBON STEEL/STAINLESS STEEL |
5 | BONNET | CARBON STEEL/STAINLESS STEEL |
6 | SPRING | STAINLESSÂ STEEL |
7 | BOLT/NUT | CARBONÂ STEEL |
DIMENSIONS(mm) | |||||||||
DN | L | D | D1 | D2 | b | Z-∮d | f | H | KG |
20 | 150 | 105 | 75 | 58 | 16 | 4-14 | 2 | 73 | 3.3 |
25 | 160 | 115 | 85 | 68 | 16 | 4-14 | 2 | 75 | 4.1 |
32 | 180 | 140 | 100 | 78 | 18 | 4-18 | 2 | 84 | 6.3 |
40 | 200 | 150 | 110 | 88 | 18 | 4-18 | 3 | 95 | 7.8 |
50 | 230 | 165 | 125 | 102 | 20 | 4-18 | 3 | 109 | 11.1 |
65 | 290 | 185 | 145 | 122 | 20 | 4-18 | 3 | 129 | 16 |
80 | 310 | 200 | 160 | 138 | 22 | 8-18 | 3 | 153 | 26.2 |
100 | 350 | 220 | 180 | 158 | 24 | 8-18 | 3 | 170 | 35.9 |
125 | 400 | 250 | 210 | 188 | 26 | 8-18 | 3 | 200 | 51.2 |
150 | 480 | 285 | 240 | 212 | 26 | 8-23 | 3 | 253 | 77.8 |
200 | 600 | 340 | 295 | 268 | 30 | 12-23 | 3 | 398 | 133.9 |
250 | 730 | 405 | 355 | 320 | 32 | 12-27 | 3 | 485 | 177 |
Q. Â Do you provide samples?Is it free or extra?
A: Â Yes, we could offer the sample for free charge but do not pay the cost of the freight.
Q. Â Can I have my own Logo on the product?
A: Â Yes, you can send us your drawing and we can make your logo, but you have to bear
their own the cost.
Q. Â Can I request to change the form of packaging and transportation?
A:  Yes, we can change the form of the packaging and transportation as per your request, but you have to bear their own costs incurred during this period and the spreads.
Q. Â How long is your delivery time?
A: Â Generally it is 5-10 days if the goods are in stock.Or it is 15-20 days if the goods are not in stock,it is according to your quantity.
QÂ CÂ an I request to advance the shipment?
A:Â Â It should be depends on whether there is sufficient inventory in our warehouse.
Q. Â Can you produce the products according to my own drawings?
A: Yes, we can produce the products according to your drawings that will be most satisfy you.
Q. Â What is your payment terms?
A: Â Payment<=1000USD,100% in advance.
Payment>=1000USD,30% T/T in advance,banlance before shippment.
Gate valve:
1.Standard: DIN3352 F4 / DIN 3352 F5 / BS 5163 / BS 4504 / ANSI,ext
2.Seal: Metal seated gate valve,Rubber coat gate valve
3.Material:Cast Iron(gg25) / Ductile Iron(ggg40/ggg50)
4.Connection:Flange end / Socket end / Kinfe / Threaded end / Wafer Type,ext
5.Pressure:PN10/16/25
Butterfly valve:
1.Type:Wafer type butterfly valve / lug type butterfly valve/flange type butterfly valve(concentric and eccentric) /u type butterfly valve/grooved butterfly valve,ext
2.Pressure:PN10/16/25
3.Material:Cast Iron(gg25) / Ductile Iron(ggg40/ggg50)
4.Standard:DIN/BS/ANSI,ext
Check valve:
1.Type:Wafer(dual)check valve/Swing check valve/Slient check valve/Ball check valve/lift check valve,ext
2.Pressure:PN10/16/25
3.Material:Cast Iron(gg25) / Ductile Iron(ggg40/ggg50)
4.Standard:DIN/BS/ANSI,ext
Ball valve:
1.Material:Cast Iron(gg25) / Ductile Iron(ggg40/ggg50)
2.Standard:ANSI/JIS
3.Type:Flange ball valve/Tee ball valve/Welding ball valve,ext
Globe valve:
1.Material:Cast Iron(gg25) / Ductile Iron(ggg40/ggg50)
2.Type:Globe valve / Lift globe valve,ext
Strainer:
1.Material:Cast Iron(gg25) / Ductile Iron(ggg40/ggg50)
2.Type: Y strainer / T strainer,ext
Other valves:
Foot valve,Marine Valve,ext
If you have another questions,please feel free to contact us below:
Â
Vertical Coal Fired Boiler Introduction
Model:LSG
Capacity:200kg/h,300kg/h,500kg/h,1000kg/hDesign pressure:0.4Mpa(4bar),0.7Mpa(7bar),1.0Mpa(10bar)
Stem temperature:below 184 degree
Design fuel:coal,biomass,firewood
Vertical Coal Fired Boiler Advantages
1.It adopts large grate area, improving the coal adaptability and combustion efficiency.
2.The boiler has high dedusting efficiency, built-in deashing, and low original dust discharg e concentration;
3.It has complete control function, is safe and steady, and guarantees the operation more
4.It adopts a close isobaric wind chamber with more uniform air distribution and smooth regulation;
5.Its arch is designed by adopting momentum method, and [α" flame has more sufficient combustion;
Vertical Coal Boiler,Small Coal Boiler,Vertical Coal Steam Boiler,Vertical Coal Fired Steam Boiler,Small Coal Fired Boiler
Henan Yuanda Boiler Co., Ltd. , https://www.steamsboiler.com