Model NO.: RF-GR
Power Supply: 380V, 50Hz, 3phase
Forming Speed: 5-20m/Min
Machine Weight: About 15 Tons
Main Motor Power: 22 Kw
Trademark: suhang
Transport Package: Film and Steel
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090
PLC Panasonic Two Waves Guard Rails Forming Machine
 
 Why choose us?  
1. Advanced machinery, well trained workers.
2 .More than 10 years experience in roll forming machine Ad industry.
3. Unique designed, good quality, competitive price.
4. Full range of roll forming machine solution.


Technical Parameter
1.   Steel Sheet Thickness: 2-3.5mm (depend on requirement )
2.   Hydraulic power: 7.5Kw
3.   Transmission way: gear box
4.   Material of blad: Cr12, quenching treatment
5.   Capacity of Decoiler: 5 Ton hydraulic decoiler
6.   Forming Speed: 10-20m/min(not including punching time)
7.   Roller Groups: about 15 stations main roller
8.   Roller Material: GCr15, quenching treatment
9.   Roller Diameter: 180mm
10. Principal Axis: 45# high grade steel with quenching treatment
11. Main Motor Power: 22 Kw

 
 Main Components
 

 
 
 
 
 
 
Machine list

5 ton hydraulic Un-coiler

1 set

Main roll forming machine

1 set

Cutting

1set

Punching

2 sets

Control box

1 unit

Hydraulic station

1 unit

Out table

2 units

Working Flow of Roll Forming Machine
 Decoiler ---- Feeding --- Levelling---Punching--- Roll Forming ---- Cutting ---- Run out table

Profile for reference
Two Waves Guard Rails Forming Machine with PLC Panasonic

Machine photo
Two Waves Guard Rails Forming Machine with PLC Panasonic
Two Waves Guard Rails Forming Machine with PLC Panasonic

Application
Two Waves Guard Rails Forming Machine with PLC Panasonic

After-sale Service

- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)